CRIS
Permanent URI for this communityhttps://scripta.up.edu.mx/handle/20.500.12552/1
Browse
2 results
Search Results
Now showing 1 - 2 of 2
- Some of the metrics are blocked by yourconsent settings
Item type:Publication, Un modelo de minimización de costos de mantenimiento de equipo médico mediante lógica difusa(2019) ;Cabrera Llanos, Agustín Ignacio; Cruz Aranda, FernandoThis paper presents an algorithm based on fuzzy logic that models a Maintenance Management Plan of Medical Equipment, this is developed in three stages: In the first one, a functional inventory is generated, following the protocols recommended by the WHO and information of each team. In the second, three priority attention protocols are attached, used to select the diffuse system membership functions. In the third, a family of scenarios is generated by Monte Carlo simulation, calculating the degreeof fuzzy maintenance priority for the equipment. The results achieve that the equipment selection of the annual maintenance plan is carried out guaranteeing the availability of the priority equipment. In this article, the application of the Fennigkoh-Smith algorithms and the Wang-Levenson algorithm are improved by placing the ambiguity of the diffuse structure, making the selection of the medical equipment incorporate the range of possibilities that exist when selected in an arbitrary manner. An area of opportunity consists of incorporating a process of optimization of equipment maintenance costs with a budgetary restriction. It is concluded that the system shown is friendly and robust for the purposes proposed.Scopus© Citations 3 28 1 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, Project Valuation of a Distribution Centre of an Auxiliary Rail Freight Terminal: Using Real Options with Fuzzy Logic and Binomial Trees(2016) ;Cruz Aranda, Fernando; Cabrera Llanos, Agustín IgnacioThis paper presents the financial evaluation of the extension of an auxiliary rail freight terminal to integrate it to a logistics platform (LP). This investment phase is focused on building a distribution center (CEDI), as part of a comprehensive project of high commercial and strategic impact for Mexico. The project evaluation is done using binomial trees for the valuation of an American type real call option, incorporating the expected volatility over the expected cash flows, in order to determine the benefit of postponing the project three years. In addition, to complement this real option valuation, we incorporate the fuzzy logic theory in the process of assigning probabilities to the branches of tree. The value of the American type real call option to postpone the project three years is 30.37% of investment, while the value of real option, using fuzzy logic is 29.94% of investment, this is a better result. © 2016, ASERS Publishing House. All rights reserved.35 2
