A multi-objective probabilistic-based method to determine optimum allocation of time buffer in construction schedules

Journal
Automation in Construction
ISSN
0926-5805
Date Issued
2018
Author(s)
Mani Poshdar
Vicente A. González
Gary M. Raftery
Orozco, Francisco  
Facultad de Ingeniería - CampGDL  
Guillermo G. Cabrera-Guerrero
Type
text::journal::journal article
DOI
10.1016/j.autcon.2018.03.025
URL
https://scripta.up.edu.mx/handle/20.500.12552/2791

Creación y actualización de perfiles en Scripta+

Hosting & Support by

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Accessibility settings
  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify