  4. Analysis of Causes of Delay and Time Performance in Construction Projects
Details

Analysis of Causes of Delay and Time Performance in Construction Projects

Journal
Journal of Construction Engineering and Management
ISSN
0733-9364
1943-7862
Date Issued
2014
Author(s)
González, Pablo
González, Vicente
Molenaar, Keith
Orozco, Francisco  
Facultad de Ingeniería - CampGDL  
Type
text::journal::journal article
DOI
10.1061/(ASCE)CO.1943-7862.0000721
URL
https://scripta.up.edu.mx/handle/20.500.12552/2778
Abstract
Activity delays are a common issue in the construction industry and can increase project schedules and costs. Recent research efforts have focused on the quantitative evaluation of delay impacts. The literature suggests that the construction industry is in need of additional research to systematically relate the causes of delays to their impacts. To overcome this limitation, this paper analyzes delay causes in activities that were not completed as scheduled. The paper contributes to a methodology to examine the qualitative (delay causes) and quantitative (time performance) dimensions of the delay issue. The paper proposes two indicators, as follows: (1) reason for noncompliance (RNC) as an indicator that characterizes scheduling failures, and (2) delay index (DI) as a time-performance indicator that describes the impacts of delay on critical and noncritical activities. The paper presents two building projects as case studies, with planning and subcontractors as the primary RNCs that have the greatest impact on time performance. Planning was the most harmful delay cause on time performance.

Creación y actualización de perfiles en Scripta+

Hosting & Support by

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Accessibility settings
  • Privacy policy
  • End User Agreement
  • Send Feedback
Repository logo COAR Notify