Moreno Abril, Francisco
Main Affiliation
Preferred name
Moreno Abril, Francisco
Official Name
Moreno Abril, Francisco
ORCID
0000-0003-4058-9350
Scopus Author ID
57216589010
16 results
Now showing 1 - 10 of 16
- Some of the metrics are blocked by yourconsent settings
Item type:Publication, Additive manufacturing in the construction industry(2025) ;Eric Forcael ;Moisés Medina ;Alexander Opazo-Vega; Mayo Maldonado, Jonathan29Scopus© Citations 17 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, Relevancia y Gestión del Diseño Interior en la Construcción(Elsevier BV, 2024) ;Sánchez-Pelayo, Alejandra Lissete; El artículo examina la relevancia de integrar el diseño interior en la construcción. La originalidad del estudio radica en la carencia de estudios previos sobre el tema, a pesar de que la literatura más reciente subraya la necesidad de integrar desde el principio y hasta el final a todos los actores clave de una obra (propietarios, ingenieros, arquitectos, y otros). Sin embargo, en México poco se sabe sobre el papel del interiorista y cabría esperar que la situación sea similar en América Latina. Para ello se utilizó una encuesta, aplicada en 2022 a 56 constructores representativos de la población de agremiados a la Cámara Mexicana de la Industria de la Construcción (CMIC) del Estado de Jalisco (N=502; n=56). La evidencia sugiere que la adecuada gestión e integración del diseño interior en distintas etapas de un proyecto (particularmente en el anteproyecto, el proyecto ejecutivo, el presupuesto de inversión y los acabados) tiene como consecuencia aumentar su calidad, además, no se perciben incrementos injustificados en los costos (71% de los encuestados así lo señalan). Asimismo, el diseño interior es particularmente relevante para los constructores de vivienda con clientes de altos ingresos, quienes suelen demandar al interiorista. Sin embargo, cabe reconocer que la veracidad de las respuestas de los encuestados podría generar sesgos y futuras investigaciones son necesarias para corroborar los hallazgos y proporcionar nueva información.16 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, Programación de flujo recurso electrónico y de recursos en la industria de la construcción utilizando métodos matemáticos(2008)Los alcances que se incluirán dentro de la tesis describiendo cada uno de los capítulos son la intención de dar al lector un conocimiento necesario para poder desarrollar sus propios criterios de lo que es la programación de obra viendo tanto el punto de vista de una distribución lineal y el conocer otros tipos de distribución. En el capítulo II, se presentará el marco teórico de la tesis que incluirá información básica de lo que es la programación de obra, adentrándose al sistema PERT, a CPM, y al uso de herramientas más innovadoras como son la simulación por Monte Carlo. Se presentará los diversos tipos de distribuciones estadísticas y las más usuales para realizar un análisis más completo, y terminando con una propuesta de un tema a desarrollar para futuras tesis, como es la nivelación de recursos. En el capítulo III, la propuesta de la encuesta a ser tomada dentro de nuestro medio en Guadalajara, junto con el análisis del número de certidumbre para obtener el número de encuestas a ser tomada, al igual se seleccionarán las preguntas para ser presentado. Se presentará los resultados totales de la encuesta, así como las Observaciones y comentarios de cómo se presentó la encuesta a los encuestados. Dentro de la parte final de este capítulo, se presentará una propuesta como realizar una modelo para poder calcular una programación usando cualquier tipo de distribución (utilizando Excel como plataforma), y usando la simulación de Monte Carlo para poder calcular la duración de las actividades, visto desde una forma práctica. En el capítulo IV, se realizará el análisis de los resultados obtenidos dentro de las encuestas tomadas y viendo la posibilidad y el campo de acción que se puede presentar para el uso de distribuciones fuera de la uniforme y el interés de la sociedad constructora. De igual manera se realizará un ejemplo práctico en la cual se presentará una simulación con una corrida utilizando únicamente distribución uniforme y la duración determinada por experiencia, comparándola contra uso de varias distribuciones por tipo de insumo y la duración de las actividades determinada por la simulación de Monte Carlo, comparando una con otra. En el capítulo V, se mostrará las conclusiones de los análisis realizados y los futuros campos de acción que pueden partir de esta tesis para futuras investigaciones, como son la revisión de este análisis con una obra en proceso a corto plaza, mediano plazo y largo plazo, y el uso de la herramienta de nivelación de recursos.17 6 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, Artificial Bee Colony Algorithm to Optimize the Safety Distance of Workers in Construction Projects(2024) ;Eric Forcael ;Ibzan Carriel ;Alexander Opazo-Vega; Duzgun Agdas<jats:p>This paper presents the results of a simulation model regarding the productivity and safety working space for construction workers through the floors of a building using swarm intelligence (SI), a field of artificial intelligence (AI), and specifically using artificial bee colony (ABC) optimization. After designing the algorithm used to build the simulation model, the simulation was used in an actual building project by comparing the travel times of workers conventionally transporting material with another group working on routes optimized by the algorithm. Thus, the proposed algorithm provides routes combining shorter travel times and correct distances between workers when transporting materials in a construction site, handling the interference between crews. After validating the algorithm on-site, no statistically significant differences were found between the travel times of workers and the times delivered by the algorithm. Additionally, the travel times using the routes obtained through the algorithm were significantly lower than those made by workers who moved freely without a predefined route. In summary, the algorithm proposed may help construction practitioners maintain safe movements that respond to hazard contexts imposed by any restriction that demands a safety distance.</jats:p>20 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, Agile Project Management in the Pre-Construction Stage: Facing the Challenges of Projectification in the Construction Industry(2024); ;Eric Forcael; ;Ginnia MoroniFelipe Baesler<jats:p>Given the complex and dispersed nature of construction projects, which demand collaboration among varied experts, it is crucial to reevaluate project management and execution approaches to enhance their performance. Agile principles offer a path towards heightened responsiveness within tasks and processes, addressing the construction industry’s fast-paced nature and growing client demands for timely project completion. However, adopting new management methodologies, such as Agile, needs a significant cultural shift, enabling the cultivation of multi-skilled and self-managing teams. Projectification, a growing trend in contemporary society where more activities are managed as projects, has gained significant relevance in recent years. This study examines the application of Agile project management (specifically Agile Scrum methodology) during the pre-construction phase of a construction project through the lens of Projectification. As evidenced by the research results, applying the Agile methodology in the pre-construction phase may help enhance flexibility and collaboration, enabling teams to adapt quickly to evolving project requirements and unforeseen challenges. The findings demonstrate that Agile methodologies offer numerous benefits, including enhanced adaptability, flexibility, accountability, transparency, and teamwork. Additionally, there were significant reductions in time and costs, emphasizing the value of Agile practices in construction project management.</jats:p>13 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, A feasibility-based framework for decentralized urban growth in megacity regions(Elsevier BV, 2026-06); ;Forcael, Eric; ; Ramos, LeonardoRapid metropolitan growth in water-stressed megacity regions has renewed interest in decentralized urban development, yet such strategies often overlook binding environmental and legal constraints. This study applies a feasibility-screening framework to evaluate decentralized growth potential in the Guadalajara Metropolitan Area (GMA), Mexico, using a sequential, non-compensatory approach based on necessary conditions rather than composite sustainability indices. Transport connectivity, population and territorial context, food production capacity, and integrated water availability are assessed for three candidate municipalities. While all cases satisfy the structural and contextual conditions, the results indicate that water availability constitutes the dominant limiting factor when physical supply and legal accessibility are jointly considered. Only one municipality meets the water feasibility criterion under current conditions, whereas the others fail despite favorable performance in other dimensions. The framework provides a transferable tool for early-stage urban planning in water-constrained megacity regions.33 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, Fixed start method for repetitive project scheduling with simulated annealing(2025); ;Eric Forcael ;Felipe Baesler; Duzgun Agdas14 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, Gini Index in the Construction Industry; the case study of Chile(2021) ;Forcael, Eric ;Sagredo, Cristóbal ;Garcés, Gonzalo ;Peña, Camilo2 35 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, Lean Construction Barriers From the Organizational Culture Lens(International Group for Lean Construction, 2025-06-02); ; ;Caroll Francesconi; Reinaldo Valdebenito25 - Some of the metrics are blocked by yourconsent settings
Item type:Publication, Barriers to BIM Implementation in Bridge Construction: A Case Study(International Group for Lean Construction, 2023-06-26) ;Eric Forcael ;Alonso Castro ;Francisco Bedwell ;Euro Casanova22
